In a Virginia purchase using the Virginia REALTORS forms, the clock that matters is the Home Inspection Deadline, a number of days after ratification that you and the seller write into the Home Inspection Contingency Addendum (Form 600D). The form does not use the phrase “due diligence period,” so check what your own contract calls it.
Before that deadline, you must pick one of two paths: ask for repairs by delivering the full inspection report and a Removal Addendum, or terminate by delivering proof the inspection happened plus written notice. Do neither, and the contingency expires while the contract stays in force. That is the whole timeline in two sentences. The details below decide whether you keep your deposit and your options.
The three clocks inside the inspection contingency
The January 2019 edition of Form 600D sets up three separate clocks. Every number of days is a blank filled in at contract time, so the numbers come from your contract, not from Virginia law.
| Clock | Starts | Length | What you must do |
|---|---|---|---|
| Home Inspection Deadline | Ratification of the contract | Blank, set in your contract | Finish inspections and deliver a Removal Addendum or a termination notice with proof of inspection |
| Negotiation Period | When the seller receives your Removal Addendum | Blank, set in your contract | Trade offers and counteroffers; sign a new Removal Addendum if you agree |
| Purchaser’s Election Period | When the Negotiation Period ends without agreement | Blank, set in your contract | Terminate in writing, or the contingency is removed and you stay in the contract |
| Extra time for specialist inspections | If your inspector recommends further inspections | Up to 5 days, at your expense | Notify the seller before the deadline |
Miss the last step and the same outcome follows: your contingency is gone. That is why buyers set a calendar reminder for each date the day they sign.
Get the Richmond closing-timeline checklist
Inspection dates, loan deadlines and settlement all run on different clocks. Our closing-timeline checklist lays them side by side so you can see which one ends first.
What to ask for after the inspection
Form 600D defines a deficiency as something that could affect a reasonable person’s decision to buy. It leaves out cosmetic items, personal preferences, grandfathered features that still work, and a working system that is merely near or past its expected life. A Virginia REALTORS Legal Hotline answer from June 2025 applies this to a case where a seller agreed to fix a leaking roof but refused to repaint a basement: the paint was cosmetic, so refusing it did not give the buyer grounds to terminate.
Build your request around what the form treats as a deficiency:
- Safety and function: active roof leaks, electrical hazards, plumbing leaks, heating or cooling that does not work.
- Water and structure: drainage, moisture, foundation movement. Ask an inspector or specialist to describe the cause, not only the symptom.
- Systems at end of life: the form excludes a system that works but is old, so a request here is a negotiation, not an entitlement.
You can ask for repairs, or you can propose a different remedy in the Removal Addendum. A price change or credit is one option. Our guide to seller credits and the limits by loan type explains why a credit has to fit your lender’s rules. Ask your lender before you propose one.
Scheduling inspections so the deadline works
Book the general inspection the same day you go under contract. Virginia has required home inspectors to be licensed since July 1, 2017, according to the Department of Professional and Occupational Regulation. Confirm the license before you hire.
Form 600D lists what an inspection may cover: structure, roof, HVAC, electrical, plumbing, appliances, drainage, windows, well and septic systems, geotechnical conditions, lead-based paint and radon. If the house has detached buildings, add them to the plan. Our guide to sheds, detached garages and carports covers what to look at. Whether you are shopping in the City of Richmond, Henrico, Chesterfield or Goochland, the form works the same way.
The main Form 600 contract adds its own numbers. In the 2020 edition, a wood-infestation report must be dated within 30 days before settlement, and a well coliform certificate must be dated within 30 days of settlement. If the home was built before 1978, the form gives you a 10-day right to a lead-based paint inspection unless waived. For FHA or VA loans, written notice of a low appraisal is due within three days of learning the value. Read all of this in the Form 600 text.
How the inspection clock fits with the loan and title clocks
The inspection deadline is not the only date in the contract. In the Form 600 2020 edition, a buyer using a loan must apply within five business days of acceptance, and a cash buyer must verify funds within 15 days. The loan commitment deadline is a blank that matches the settlement date if left empty. Title defects the seller can cure must be cured within 60 days, or you may terminate and get your deposit back or waive the defect. If a condominium or property owners’ association applies, you also get a cancellation window after you receive the resale certificate or association packet, with the number of days set in a blank.
Put those next to your inspection dates. A common squeeze is an inspection that finds a problem on the last day, just as the loan is moving through underwriting. If a repair or credit will change the numbers your lender sees, tell your loan officer the day you send the Removal Addendum. Our preferred lenders can talk through how a credit would affect your loan before you send it.
If you need more time
Extensions happen by amending the contract, and both sides must sign. Virginia REALTORS says that when the parties extend the Home Inspection Deadline, the Negotiation Period and Purchaser’s Election Period move with it. Get any extension in writing before the original deadline passes. A text message or a verbal “that’s fine” may not be an amendment.
After the deal: the walkthrough
Resolved repairs do not end your checking. Under the Form 600 contract, a presettlement verification may happen no more than 10 days before settlement, according to a Virginia REALTORS Legal Hotline answer. Use it to confirm repairs were done and nothing new is damaged. If you are buying in Hanover, Powhatan or anywhere else, book the walkthrough with your agent as soon as the settlement date is set.
You can also keep an eye on active listings while your inspection runs, in case you decide to terminate.
Next step
Write every date from your contract into one calendar the day you sign.
Get the Richmond closing-timeline checklist
See inspection, financing and settlement dates in one order, so you do not miss the first deadline.
Frequently asked questions
Do I have to have a home inspection in Virginia?
No statute requires one for a buyer. In the Form 600 contract the buyer initials to waive or to desire a professional home inspection. Waiving means you keep none of the inspection rights described above.
What if I never deliver a Removal Addendum or termination notice?
The contingency expires and the contract continues without it, per the text of Form 600D.
Who gets the earnest money if I terminate under the addendum?
The form has a blank to say whether the buyer or the seller receives it, and both parties sign a release. Your contract’s selection controls, so read that blank before you sign.
Who pays for the inspection?
The buyer, according to Form 600D, which makes the inspection at the buyer’s discretion and expense.
Who fixes damage the inspector causes?
The buyer. Form 600D has the buyer repair damage caused by the buyer or its contractors and indemnify the seller and brokerages from claims arising from the inspections.
Do utilities have to be on for the inspection?
Yes. Both the main contract and the addendum require the seller to keep utilities on for inspections the contract provides.
How much will a seller have to repair?
The Form 600 contract has a Remediation Limit blank, and the form says it defaults to $1,000 if left blank. Check that blank before you sign.
What if the house is damaged before settlement?
Under the Form 600 contract (2020 edition), the risk of loss stays with the seller until settlement. If the damage is substantial, the purchaser may terminate, or keep the contract and take over the seller’s insurance rights. Ask a Virginia real estate attorney how that applies to your facts.
Do I get any protection if I skip the inspection contingency?
The Form 600 contract (2020 edition) says that when the purchaser has no inspection contingency, the seller warrants that the appliances, heating and cooling, plumbing including septic, and electrical systems are in working order at settlement or occupancy. That is narrower than an inspection, so read the paragraph before relying on it.
Can the seller see my inspection report?
Yes. Form 600D lets the seller request a full copy of the report.
