Before you buy vacant land near Richmond, check three things: whether the soil can support a septic system (or whether public sewer reaches the lot), how water will get there, and what the zoning lets you build. A lot with no approvable sewage solution is a lot you may not be able to build on, so get the soil answer before you give up your contingencies.
This guide covers the steps in the order that protects your money. It applies to land in Chesterfield, Henrico, Hanover, Goochland and Powhatan, though each locality runs its own planning and utilities offices. If your lot may need a well too, our posts on well and septic requirements for Richmond buyers and buying a home with a septic system or well cover the house-and-system side. This post is about raw land.
The soil evaluation decides whether the lot is a home site
People say “perc test,” but the Virginia Department of Health (VDH) uses a broader document called a Site and Soil Evaluation Report. It records the landscape position, slope, and depth to rock, the depth to the seasonal water table, whether the site floods or stays saturated, an estimated percolation rate, and whether a percolation test was actually done. It also includes a hole-by-hole log of soil color and texture, according to the VDH site and soil evaluation form. The result is binary: site approved or site disapproved. Disapproval reasons on the form include shallow rock, slow absorption, not enough acceptable area, or a system too close to a well.
An approval is not general. It records the dispersal method, the treatment level, the depth, and the absorption area for both a primary field and a reserve field. Ask for the full report, not a one-line “the lot perked” from the seller. Confirm that the approved area is where you plan to put the house, driveway and any outbuildings.
Who does the work? The same VDH form says the local health department can do the evaluation, or a private onsite soil evaluator or professional engineer can. Under Code of Virginia section 32.1-163.5, VDH must accept private evaluations and designs from a licensed onsite soil evaluator (or a licensed professional engineer working with one). The same section gives the department 15 working days to act on a single-lot construction permit request once it receives it in writing, and 60 days for multiple-lot certification letters or subdivision review. If the department does not act in time, the evaluation is deemed approved. For you, the practical point is that a private evaluator gives you another route to an answer while your contract clock is running.
Get a saved search for Richmond-area land
Tell us the counties and acreage range you want, and we will set up a saved search so new lots reach you the day they list. You can also browse Richmond homes with acreage to see what is on the market now.
Write the soil result into your contract
Buy-and-hope is how buyers end up owning a lot they cannot use. Ask your agent to build a soil and septic contingency into the offer, with enough days for an evaluator to schedule the site visit and for the health department to review. Ask the seller for any existing evaluation, permit or plat in hand, and check that the sketch matches the lot you are buying. For a private evaluation, VDH’s form requires a sketch showing sewage systems, wells and structures within 200 feet of the site and reserve site, so a neighbor’s well can matter.
Know the permit vocabulary. The state’s sewage handling and disposal regulation 12VAC5-610-250 says construction permits are issued by the commissioner, with requests going first to the district or local health department. A single-residence septic tank and drainfield is a Type I system, where an application is normally all that is needed. The same section describes conditional construction permits for systems that do not fully meet certain criteria. A conditional permit must be recorded in the circuit court land records, and it does not take effect until one day after the health department is told it was recorded. Any later owner must follow its conditions, so read what was recorded before you buy.
Utilities: public hookup or on-site systems
If public water and sewer serve the lot, the cost shifts from a soil test to connection fees. Henrico County publishes a 2026-2027 connection fee schedule. For a new single-family dwelling where service is available, it lists $8,005 for water and $9,655 for sewer, $17,660 together. Where a developer installs the connections, it lists $5,110 for water and $6,180 for sewer, $11,290 together. The page did not state an effective date, so confirm the current amounts with Henrico’s connection fee page before you budget. Ask the other counties’ utilities directly for their fee schedules.
Ask three questions in writing: does public water reach the lot line, does public sewer, and who pays to extend either. Then ask electric and gas providers about service at that address. If the answer is a well and a septic field, plan for both, and compare the cost against buying a lot with service already in place.
Land in Powhatan, Goochland and Hanover can come with very different utility situations from a lot in Midlothian or Varina. The only way to know is to ask about the specific parcel.
Zoning: what you may build on this lot
Zoning controls the use, the minimum lot size, setbacks and sometimes whether you need a special approval. Localities use their own terms. Chesterfield, for example, uses “conditional use permit,” while Henrico uses “provisional use permit,” so do not assume the same rules cross a county line. Ask the planning office for the zoning district of the parcel and what is permitted by right in it.
Henrico lets owners and buyers request a zoning confirmation letter online. The steps are on the Henrico zoning confirmation letter page. The page does not list a fee or turnaround, so ask the Planning office. Whatever the county, get the answer in writing, and do not rely on what a neighboring lot is used for.
The numbers worth knowing
| Item | Number | Source |
|---|---|---|
| Review time for a single-lot septic construction permit request | 15 working days from written submission | Code of Virginia 32.1-163.5 |
| Review time for multiple-lot letters or subdivision review | 60 days from written submission | Code of Virginia 32.1-163.5 |
| Distance for wells and sewage systems shown on a private evaluator’s sketch | 200 feet | VDH Site and Soil Evaluation form |
| Henrico new single-family water and sewer connection, service available | $17,660 | Henrico 2026-2027 fee page |
| Henrico new single-family connections installed by a developer | $11,290 | Henrico 2026-2027 fee page |
Search Richmond-area land with us
Pick your counties and lot size, and we will send new listings as they appear. Then ask for our help lining up the soil evaluation, utility questions and zoning letter before your contingency period ends. A lender from our preferred lenders list can explain how land financing differs from a home loan.
Frequently asked questions
What are the four septic system types in Virginia’s rules?
Section 12VAC5-610-250 sorts systems into four types. Type I is a single-residence septic tank and drainfield. Type II covers commercial or multi-family systems or those needing pumping or enhanced distribution. Type III covers other systems and subsurface systems over 1,000 gallons per day. Type IV is privies. Most vacant-lot house buyers deal with Type I.
What is a conditional construction permit?
It is a permit for a septic system that does not fully meet certain criteria. Under 12VAC5-610-250 it must be recorded in the circuit court land records, and it takes effect one day after the health department receives notice of recording. A temporary-use conditional permit runs up to one year and can be renewed for good cause. The holder and later owners must follow its conditions.
Who pays for a private soil evaluation?
The sources reviewed do not set a cost or say who pays. It is a contract term. Ask your agent to negotiate who pays, and get the evaluator fee in writing first.
What should I ask for if the seller says the lot already has approval?
Ask for the full Site and Soil Evaluation Report and any permit. Check the approved dispersal method, the primary and reserve field areas, and the depth. The VDH form is site specific, so an approval for a different layout or a different parcel does not help you.
How does Henrico’s fee differ when a developer installs the connections?
For a new single-family dwelling, Henrico’s 2026-2027 schedule lists $11,290 for water and sewer when the developer installs the connections, against $17,660 when service is available and the county does the connection. The page does not state an effective date, so confirm the amount with Henrico Public Utilities.
How do I request a zoning letter in Henrico?
Use the Build Henrico site, choose Land Development Applications, then the Zoning Confirmation Letter type. You add each parcel separately, describe the project and the existing and proposed use, upload supporting documents, and pay online. The page does not list the fee or timing, so check with the County’s Planning office.
Do Powhatan, Goochland and Hanover work the same way as Henrico?
The state septic rules apply in all of them, and the VDH site and soil process is the same. Zoning terms, planning offices and utility fees are local. We did not read fee schedules for those counties, so ask each planning office and utility about your specific parcel.
Can I get a loan for vacant land?
Land loans can differ from home loans in their terms. We did not source specific rates or down payment figures, so talk to a lender before you write an offer. Our preferred lenders page is a place to start.