If a lot has a Resource Protection Area on it, the first 100 feet of land beside the stream is protected from most development, so a new deck, addition, pool or tree removal there may be limited or refused. Whether a particular lot has one is a question only the locality can answer. This guide explains what the terms mean under Virginia law and how to ask in the City of Richmond, Chesterfield, Henrico, Hanover, Goochland and Powhatan.
What the Bay Act is and where Richmond-area counties sit
The Chesapeake Bay Preservation Act is Article 2.5 of Chapter 3.1 of Title 62.1 in the Code of Virginia. Section 62.1-44.15:67 sets up a cooperative program in which localities lead planning and the state provides criteria and oversight. Section 62.1-44.15:74 requires every county, city and town in Tidewater Virginia to designate Chesapeake Bay Preservation Areas using the state criteria. Under the definition in section 62.1-44.15:68, Tidewater Virginia includes the City of Richmond, Chesterfield, Hanover and Henrico. Goochland and Powhatan are not on that list. Section 62.1-44.15:75 lets localities outside Tidewater use the criteria on their own if they choose.
The criteria are written by the State Water Control Board in a regulation, 9VAC25-830. It covers how a locality maps these areas and what can happen inside them.
RPA versus RMA
A Chesapeake Bay Preservation Area has two parts, and the difference matters for what you can do.
| Term | What it is | Key figure | Source |
|---|---|---|---|
| Resource Protection Area (RPA) | Land beside perennial streams and certain wetlands and tidal shores, plus a buffer | Buffer at least 100 feet wide | 9VAC25-830-80 |
| Resource Management Area (RMA) | Land next to the RPA that could affect water quality if misused, with less restrictive rules | Borders the whole inland edge of the RPA | City of Richmond guide |
| Land disturbance study | Water quality impact assessment for land disturbance in an RPA | 2,500 square feet or more (Richmond example) | City of Richmond guide |
| Penalty ceiling in a local ordinance | Civil penalty a locality may adopt | Up to $5,000 per day | 62.1-44.15:74 |
The regulation at 9VAC25-830-80 says the 100-foot buffer sits next to and landward of the mapped water features and counts as part of the RPA even where clearing or encroachment is permitted. The City of Richmond’s plain language guide describes the RMA as the land next to an RPA with less restrictive rules.
Why a deck, addition, pool or tree can be limited
The state regulation at 9VAC25-830-140 sets the criteria for RPAs. These are the points a buyer should know.
- Development is allowed only in listed cases. The regulation names six categories: water-dependent uses, redevelopment, development in an Intensely Developed Area, a listed new use, certain road or driveway crossings, and certain flood control or stormwater facilities. A backyard deck or pool is not one of the named categories, so a request would go through the local exception process, not an automatic yes.
- A water quality impact assessment is required for proposed land disturbance in an RPA.
- Vegetation removal needs local approval. The reasons the regulation lists are sight lines, access paths, woodlot management and best management practices. Dead, diseased or dying trees and noxious weeds may be removed.
- The buffer is not shrunk because a use is permitted. The full 100 feet stays.
- Older lots get some flexibility. For lots recorded before October 1, 1989, an encroachment may be allowed administratively, limited to the minimum needed for a principal structure and utilities, and not into the seaward 50 feet. A second rule covers lots recorded from October 1, 1989 to March 1, 2002.
The regulation does not speak to additions or accessory structures by name, so the locality’s own ordinance decides. That is why the question has to go to the locality, not to the seller or to a general guide. If you plan to enlarge a house, also read about zoning variances and boards of zoning appeals, since those are a separate process.
Find homes first, then ask the locality about the ones you like
Set up a saved search for the City of Richmond, Chesterfield, Henrico, Hanover, Goochland and Powhatan. When a home you like has a stream on the lot, ask the locality the questions below before your inspection period ends.
How to ask each locality
Each locality uses its own terms and tools. The details below come from each locality’s own pages.
City of Richmond
The City’s Department of Public Utilities has a plain language guide to the Chesapeake Bay Preservation Area rules. It says to check the City’s Chesapeake Bay Preservation Areas map and to contact Public Utilities if you are unsure. Land disturbance in a Chesapeake Bay Preservation Area needs approval of the Administrator on a Chesapeake Bay Site Plan, and starting without approval can bring penalties of up to $5,000 per day, stop-work orders and restoration. Canopy trees 35 feet or taller with trunks 12 inches or wider, and understory trees 12 to 35 feet tall with trunks 4 inches or wider, are protected. Removal needs approval and a qualifying reason, with replacement of 3 trees per canopy tree and 2 per understory tree. Community pages such as The Fan and Forest Hill tell you about the area, but only the City can answer for a given lot.
Chesterfield County
Chesterfield’s Chesapeake Bay Preservation Areas page calls RPAs 100-foot natural buffers along streams, rivers, lakes, reservoirs, tidal shores and adjacent non-tidal wetlands, and says they cover over 850 miles of perennial streams. You can look at the county hydrography map and select the RPA layer. To have RPA limits formally established, a qualified agent or consultant completes an RPA designation application that the owner signs. The county says review takes about 6 to 8 weeks. Encroachment requests use the county’s online Resource Protection Area Encroachment Request form. See Midlothian and Bon Air for community pages.
Henrico County
Henrico’s Resource Protection Areas page says the county assesses water bodies during plan, subdivision and building permit reviews, and that owners can ask the county to assess streams on their land. Owners or agents can also submit a perennial versus intermittent determination on a DEQ-approved form. Henrico lists new development, parking lots, sheds, clear-cutting, grading or filling and new lawns among prohibited uses in an RPA. An exception starts with a meeting with Environmental Services staff and a Chesapeake Bay Exception Pre-Application Questionnaire, and the Director of Public Works decides. Look at Glen Allen and Tuckahoe for community pages.
Hanover County
Hanover’s frequently asked question on Chesapeake Bay Preservation Areas says a large portion of the county falls within a CBPA and that RPAs are the zones closest to streams, wetlands and floodplains. It says your survey plat may show whether a lot is in a CBPA but often does not, so a site-specific determination is usually needed. The Department of Public Works is the contact. The same FAQ says septic drainfields inside a CBPA must be pumped or inspected every five years.
Goochland and Powhatan
Neither county is on the statute’s Tidewater list, and a local Bay Act page was not found for either. That does not mean no stream or floodplain rules apply. Ask the county planning department what stream buffer, floodplain or wetlands rules apply to the lot, and which department answers.
A question list to send before your inspection period ends
- Does this parcel contain or touch an RPA or RMA, or any local stream buffer?
- Has anyone formally determined the limits, and when?
- Would a deck, addition, pool, shed or tree removal in the area I have in mind need approval or an exception?
- What is the process and the timeline, and what does the application cost?
- Do existing structures, patios or clearing on the lot have approvals on file?
- What is the penalty for unapproved work, and does it carry over to a new owner?
Write the answers down. If a plan matters to you, ask for them in writing before you commit. Your agent can help you send the questions, and our buyer process shows where due diligence fits. Where a steep lot adds questions about stability, see retaining walls and slopes. You can also browse current listings and compare lots. For a county overview see Hanover, Goochland and Powhatan.
Keep your search moving
Set up a saved search for the City of Richmond, Chesterfield, Henrico, Hanover, Goochland and Powhatan, then use the questions above on each home with a stream on the lot.
Frequently asked questions
Does a stream on the lot always mean an RPA?
No. State rules apply an RPA to perennial water features and certain wetlands and shores. A seasonal ditch or intermittent stream may be treated differently, and the locality decides how perennial flow is determined. Henrico, for example, lets owners submit a perennial versus intermittent determination on a DEQ-approved form.
How long does it take Chesterfield to formally set RPA limits?
Chesterfield says its review of an RPA designation application takes about 6 to 8 weeks, and final limits are set during plan review. Plan for that if you want a ruling before closing.
Can I remove a dead tree in the RPA?
The state regulation at 9VAC25-830-140 allows removing dead, diseased or dying trees and noxious weeds. Vegetation removal generally needs local approval for other reasons, so ask the locality before you cut anything.
Can I appeal a City of Richmond decision?
The City’s plain language guide says you can file a written appeal with the Director within 30 days of the decision, with a $50 fee. A hearing is held within 45 days, and a further appeal to Circuit Court is possible within 30 days of the Director’s decision.
What are the penalties for violating the rules?
Section 62.1-44.15:74 lets a locality adopt civil penalties of up to $5,000 per day, or civil charges up to $10,000 per violation with consent. Richmond’s guide also lists stop-work orders and restoration. What a locality actually charges depends on its ordinance.
Does my survey plat show whether the lot is in a CBPA?
Hanover says a plat may show it but often does not, and a site-specific determination is usually needed. Do not rely on a plat alone.
Does Hanover treat septic systems differently inside a CBPA?
Yes. Hanover’s FAQ says septic drainfields inside a CBPA must be pumped or inspected every five years. Ask the seller for pump-out records if the home has septic.
What is an intensely developed area?
It is a category in the state regulation where a locality has more discretion, for example over whether to require buffer vegetation. Whether a lot is in one is a local designation, so ask the locality.